Project Review
MULTIPLE IRON ORE TARGETS ON 45 KM TREND CONTROLLED BY GOLDZONE
HIGH-GRADE ROCK-CHIPS
- Up to 66.3% Fe
- >45 km DISCONTINUOUS STRIKE
DSO & MAGNETITE POTENTIAL
- OPTION TO TRANSPORT TO KOOLYANOBBING THEN RAIL TO PORT OF ESPERANCE
DRILL TESTING REQUIRED
- WALK UP OUTCROPPING TARGETS
Red outlines indicate locations of following slides.


- MULTIPLE TARGETS IDENTIFIED ON MAG MAPPING
- 2023 GZI Sampling confirms FE prospectivity of key targets 1 and 8.

In 2010 Fe Limited identified an ‘Exploration Target’ comprising 180-200 Mt of Banded Iron Formation mineralisation across the Mt Elvire Project AREA following a review of all exploration data and re-interpretation of geophysical data.

