Johnston Range

Project Review

MULTIPLE IRON ORE TARGETS ON 45 KM TREND CONTROLLED BY GOLDZONE

HIGH-GRADE ROCK-CHIPS

  • Up to 66.3% Fe
  • >45 km DISCONTINUOUS STRIKE

DSO & MAGNETITE POTENTIAL

  • OPTION TO TRANSPORT TO KOOLYANOBBING THEN RAIL TO PORT OF ESPERANCE

DRILL TESTING REQUIRED

  • WALK UP OUTCROPPING TARGETS

Red outlines indicate locations of following slides.

Target Generation in NE Johnston Range tenements over Magnetics (TMI RTP)
  • MULTIPLE TARGETS IDENTIFIED ON MAG MAPPING
  • 2023 GZI Sampling confirms FE prospectivity of key targets 1 and 8.

In 2010 Fe Limited identified an ‘Exploration Target’ comprising 180-200 Mt of Banded Iron Formation mineralisation across the Mt Elvire Project AREA following a review of all exploration data and re-interpretation of geophysical data.

Target Generation in NE Johnston Range tenements over Magnetics (TMI RTP)